Post Jobs

HVDS CASE STUDY

Power losses in LT arrangement for each consumer by evaluating their corresponding line lengths of feeder and current values as shown in table no. Generation Total capacity till The details are as under in table 1 [1]. Total transformer losses per units units annum 6. Therefore, loss minimization in power system has assumed greater significance HVDS scheme has led to the formulation of new strategy of energy conservation and minimization of transmission and distribution losses by reducing the power theft. The performance of the feeder may be improved by the HVDS system installation, which results in saving of total losses per annum and an annual savings of

Therefore, loss minimization in power system has assumed greater significance HVDS scheme has led to the formulation of new strategy of energy conservation and minimization of transmission and distribution losses by reducing the power theft. This paper demonstrates the capability of load factor and load loss factor to calculate the power losses of the network. In fact, it has become essential ingredient for improving the quality of life and its absence is associated with poverty and poor quality of life. Total power losses At power factor Unity and at various temperatures On the basis of the above parameters, the voltage drop calculations had been estimated in table no.

Sub- transmission and distribution systems constitute the link between electricity utilities and consumers. Pilferage on HT system is assumed to negligible. Sarang Pande et al in [9] presented a paper, in which a method for energy losses calculation is presented. In fact, it has become essential ingredient for improving the quality of life and its absence is associated with poverty and poor quality of life.

Total power losses per annum Long distance to supply loads causes a significant amount of voltage drop across the distribution lines. In 1st stage, the power losses including the theft and losses in the line and transformer losses for both LT and HT systems are determined and then in 2 nd stage, determination of annual savings and payback period is carried out alongwith the complete comparison of LVDS and HVDS system of 11kV feeder.

  KKHSOU MSW DISSERTATION

However, the consumers at the extreme end of the feeders have been experiencing low voltage levels. This paper demonstrates the capability of load factor and load loss factor to calculate the power losses of the network.

Case Study: High Voltage Distribution System (HVDS) Implementation in BESCOM and MGVCL

caes For this purpose, two stage methodology is used. So, we require the economical way to provide the electrical energy by State Electricity Boards to various consumers at minimum voltage drop and reduce the regulation of voltage.

Isha Bansal et al in [10] presented a paper, in which it stydy presented to implement a distribution system having negligible losses, high quality of supply and reliability as the substantial amount of generated power is being wasted as losses. Remember me on this computer. Electric power providers have a duty to ensure that the consumers are always supplied with the required voltage level. Therefore, loss minimization in power system has assumed greater significance HVDS scheme has led to the formulation of new strategy of energy conservation and minimization of transmission and distribution losses by reducing the power theft.

Qureshi et al in [6] presented a paper in his research to develop and guide lines for distribution engineers to show that by reducing the energy losses of the distribution systems available capacity of the system may be conserved without outing up additional capacity.

hvds case study

The results are satisfactorily obtained in the above case study, theoretically. At power factor Unity and at various temperatures On the basis of the above parameters, the voltage drop calculations had been estimated in table no.

Total losses per annum This results in improving the stability as well as energy handling capacity of the system at minimum cost. The power factor assumed to be used as 0.

Due to this unplanned hfds in the system, the supply conditions were sacrificed to meet the required targets. Total transformer losses per units units annum 6.

  NIJ DISSERTATION FELLOWSHIP 2014

The results obtained can be used for financial loss calculation and can be presented to regulate the tariff determination process. Estimation of Current at different power factor On the basis of the current estimation at reference power factor of 0.

Nuclear Power 20 nuclear reactors in operation, generating 5.

Generation Total capacity till The performance of the feeder may be improved by the HVDS system installation, which results in saving of total losses per annum and an annual savings of Thus, the distribution sectors require studt system to provide electrical energy at a suitable prize and at a minimum voltage drop to reduce the voltage regulation.

Calculations of power losses of 11kV Ganga Nagar Road Feeder The size of conductor used in hvde 11kV feeder, which is 30 and 20mm 2 and the resistance for this particular conductor is 0. The above alteration is proposed to be made on 0.

Case Study: High Voltage Distribution System (HVDS) Implementation in BESCOM and MGVCL

The technical losses are the losses occurred in the electrical elements during of transmission of stucy from source to consumer and mainly comprises of ohmic losses. The installed capacity generation in Punjab is as shown in table 2 [2]. Attachie and Franklin N. Efficient functioning of these segments of the electricity utility is essential to sustain the growth of the power sector and the economy of the country.

At power factor 0. Estimation of Current in feeder lines On the basis of the data of feeder, the calculation of current flowing through the feeder lines can be calculated as under in table 4.

hvds case study